MPC Property Maintenance

MPC Property Maintenance All aspects of property improvements
(2)

We provide reliable and trusted property maintenance for domestic and commercial premises.

A recently completed bathroom install in Mutley.
02/02/2018

A recently completed bathroom install in Mutley.

We converted this property in Wembury from a 6 to a 5 bedroom house recently . Built in wardrobe and 2 stud walls remove...
08/01/2018

We converted this property in Wembury from a 6 to a 5 bedroom house recently . Built in wardrobe and 2 stud walls removed. New stud wall installed followed by both rooms being plastered and decorated to high standard.

Final  job for 2017. Floor and wall tiling. New suite and radiator installed.
22/12/2017

Final job for 2017. Floor and wall tiling. New suite and radiator installed.

Recently completed bathroom in Greenbank. New suite , floor and wall tiles and full re Dec.
22/12/2017

Recently completed bathroom in Greenbank. New suite , floor and wall tiles and full re Dec.

Our customer wanted to come home to a hotel bathroom after being away for 2 weeks. Think we achieved that. Stunning.
27/11/2017

Our customer wanted to come home to a hotel bathroom after being away for 2 weeks. Think we achieved that. Stunning.

Finished this kitchen in Plymstock  today.
20/10/2017

Finished this kitchen in Plymstock today.

Last week's work. Granite worktops have been templated and being fitted later this week.  Just the hob ,  sink and taps ...
18/10/2017

Last week's work. Granite worktops have been templated and being fitted later this week. Just the hob , sink and taps left to fit

The start of a busy week !!
11/10/2017

The start of a busy week !!

Completed the decorating on this property in Hartley recently. Beautiful house and a nice choice of paint colours. No ma...
11/10/2017

Completed the decorating on this property in Hartley recently. Beautiful house and a nice choice of paint colours. No magnolia anywhere !!

Finished this property in Saltash today. Over 20 tons of materials moved onto site via 17 steps and 6 ton of waste remov...
22/08/2017

Finished this property in Saltash today. Over 20 tons of materials moved onto site via 17 steps and 6 ton of waste removed. Thanks to Brady Property Maintenance for the blockwork and slab laying.

New decking and gravel area completed in this plympton property
22/08/2017

New decking and gravel area completed in this plympton property

It's been a busy week in Saltash
06/08/2017

It's been a busy week in Saltash

A recently completed wet room in Plympton
06/08/2017

A recently completed wet room in Plympton

These floating tv units are very big in America. First one I've done and I think it looks great. Real talking point for ...
15/07/2017

These floating tv units are very big in America. First one I've done and I think it looks great. Real talking point for visitors. Ps. That is a 55" tv !!

Two bespoke mdf units built for a property in Plympton  this week.
15/07/2017

Two bespoke mdf units built for a property in Plympton this week.

New fencing , decking and artificial grass this week and the sun was shining. Happy days
07/07/2017

New fencing , decking and artificial grass this week and the sun was shining. Happy days

This 3 storey property had water pooling on the kitchen floor beside an internal wall on the ground  floor. 3 roof tiles...
02/07/2017

This 3 storey property had water pooling on the kitchen floor beside an internal wall on the ground floor. 3 roof tiles had slipped away due to high winds. Job passed onto DFR Roofing

Decking and fencing at this property this week. In the rain again !!!
02/07/2017

Decking and fencing at this property this week. In the rain again !!!

Finished pictures of a plympton ensuite now the mirror is fitted
04/06/2017

Finished pictures of a plympton ensuite now the mirror is fitted

Completed an ensuite in Plympton this week.
27/05/2017

Completed an ensuite in Plympton this week.

Before and after pics of a kitchen we completed   recently
24/05/2017

Before and after pics of a kitchen we completed recently

A bathroom we completed recently. Fitted a stud wall to allow the fitting of a thermostatic shower along with a new suit...
24/05/2017

A bathroom we completed recently. Fitted a stud wall to allow the fitting of a thermostatic shower along with a new suite and flooring

Before and after pics of a kitchen we recently fitted
24/05/2017

Before and after pics of a kitchen we recently fitted

Nice outside job this week cladding over the existing wall blocks.
29/04/2017

Nice outside job this week cladding over the existing wall blocks.

Two cloakrooms completed this week. New stud walls constructed and clad with Aqua Panels with new toilets and sinks inst...
12/04/2017

Two cloakrooms completed this week. New stud walls constructed and clad with Aqua Panels with new toilets and sinks installed

Completed this 4 bedroomed house in Beacon Park this week.  Ceilings , walls and woodwork all coated bringing the proper...
09/04/2017

Completed this 4 bedroomed house in Beacon Park this week. Ceilings , walls and woodwork all coated bringing the property up to an excellent standard

Completed this property in Devonport this week. It had not had any work carried out on it for many years and needed a fu...
09/04/2017

Completed this property in Devonport this week. It had not had any work carried out on it for many years and needed a full refurbishment. Decorated throughout and a new bathroom and kitchen fitted.

Completed this kitchen in Eggbuckland last week. The original units had seen better days and the owner is very happy wit...
27/03/2017

Completed this kitchen in Eggbuckland last week. The original units had seen better days and the owner is very happy with her new kitchen.

Built and Installed these bespoke units into a Lipson property this week and customer is very happy with the end product...
27/02/2017

Built and Installed these bespoke units into a Lipson property this week and customer is very happy with the end product. Fantastic for storage

Recently completed this bathroom in Plympton after fitting a new kitchen and ensuite into the same property.
27/02/2017

Recently completed this bathroom in Plympton after fitting a new kitchen and ensuite into the same property.

Completed this ensuite in Plympton this week.
28/01/2017

Completed this ensuite in Plympton this week.

Early starts , late finishes but managed to squeeze this in this week ,  in time for the locksmith  owner to have his xm...
23/12/2016

Early starts , late finishes but managed to squeeze this in this week , in time for the locksmith owner to have his xmas lunch in his new kitchen. Happy Christmas

's cover photo
22/12/2016
Completed this stunning kitchen in Plympton this week . Finished with Granite and solid oak worktops. This one kept me b...
22/12/2016

Completed this stunning kitchen in Plympton this week . Finished with Granite and solid oak worktops. This one kept me busy for a bit !

Bathroom install completed after finishing the kitchen in this Manadon property. New suite , wall and floor tiles.
09/12/2016

Bathroom install completed after finishing the kitchen in this Manadon property. New suite , wall and floor tiles.

New kitchen fitted in this property in Manadon.  This install took a lot longer than expected as I had an accident on da...
09/12/2016

New kitchen fitted in this property in Manadon. This install took a lot longer than expected as I had an accident on day 3 of the install that put me off work for a month. All finished now for a very happy , understanding and patient customer. Not the best of pics as the decorator started as I finished !!

Mutley kitchen finished today including a full repaint and laminate flooring
17/09/2016

Mutley kitchen finished today including a full repaint and laminate flooring

Completed this fence in Elburton this week
17/09/2016

Completed this fence in Elburton this week

Graphite kitchen installed in Mutley. Part of the original floor had to be dug up and a new concrete slab layed which wa...
04/09/2016

Graphite kitchen installed in Mutley. Part of the original floor had to be dug up and a new concrete slab layed which was boarded over and levelled. The fire place was removed and the chimney breast wall was extended to the edge of the new larder unit. The walls were all plastered and new floor tiles fitted.

A complete transformation of a garden in Elburton completed today.  Enjoyed this one!
07/07/2016

A complete transformation of a garden in Elburton completed today. Enjoyed this one!

Another bathroom completed this week in North Prospect. Full new suite , shower enclosure , floor and wall tiles. Also f...
24/05/2016

Another bathroom completed this week in North Prospect. Full new suite , shower enclosure , floor and wall tiles. Also fitted replacement interior doors throughout the property.

New kitchen fitted in a Peverell property this week along with new wall tiles.
04/05/2016

New kitchen fitted in a Peverell property this week along with new wall tiles.

Completed the installation of this bathroom in Plympton.  New suite and wall tiles.
04/05/2016

Completed the installation of this bathroom in Plympton. New suite and wall tiles.

Completed the installation of this beautiful kitchen in Armstrong House today. Finished in Graphite grey . Stunning. The...
19/04/2016

Completed the installation of this beautiful kitchen in Armstrong House today. Finished in Graphite grey . Stunning. The reflection in the wall units shows the view from the 6th floor out over Plymouth Sound

's cover photo
19/04/2016

Address

Plympton
Plymouth
PL7

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00
Saturday 09:00 - 17:00

Telephone

07966616393

Alerts

Be the first to know and let us send you an email when MPC Property Maintenance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact the business

Send a message to MPC Property Maintenance:

Nearby home improvement businesses