On going Installation of Barb Wire Fence Guard at Tateh Premium Feeds Inc., Matin-ao, Silwal 8, Polomolok, South Cotabato

On going HDPE Pipe Installation in Tambler, General Santos City
19/10/2026

On going HDPE Pipe Installation in Tambler, General Santos City

Shortcuts Construction Materials Quantity Estimation FormulaThese formulas are rough estimation shortcuts used to predic...
19/10/2026

Shortcuts Construction Materials Quantity Estimation Formula

These formulas are rough estimation shortcuts used to predict construction material quantities from a building’s floor area. However, the values are approximate and must be verified against structural drawings and project specifications.

Steel Quantity: Building area × 25 kg/m² (rough allowance).

Concrete Quantity: Building area × 0.23 m³/m² (project-dependent allowance).

Brick Quantity: Calculate from wall dimensions, thickness, brick size, and openings.

Formwork Quantity: Estimate the contact area of formwork required for concrete.

Interior Plaster: Calculate the internal wall and ceiling surface areas.

Exterior Plaster: Calculate the external wall surface area.

Masonry Mortar: Calculate from brickwork volume and mortar-joint requirements.

Plaster Mortar: Plaster area × specified thickness; for example, 20 mm plaster requires about 0.02 m³ of wet mortar per m² before allowances.

Important: These shortcuts are not universal standards. Accurate quantities depend on building design, materials, dimensions, and local specifications.

Installation of Canopy, Construction of Comfort Room and Tiling Works for 2nd Floor at San Gabriel Homes, Poblacion, Pol...
14/10/2026

Installation of Canopy, Construction of Comfort Room and Tiling Works for 2nd Floor at San Gabriel Homes, Poblacion, Polomolok, South Cotabato

On going Construction of B**gLai Payag Mini-Function Hall in Polomolok, South Cotabato
14/10/2026

On going Construction of B**gLai Payag Mini-Function Hall in Polomolok, South Cotabato

Construction of 300 Meters Drain Canal in Tambler, General Santos City...
25/09/2026

Construction of 300 Meters Drain Canal in Tambler, General Santos City...

Construction of Function Hall at B**g Lai's Payag, Tuliao Village, Polo, Polomolok, South Cotabato.
23/09/2026

Construction of Function Hall at B**g Lai's Payag, Tuliao Village, Polo, Polomolok, South Cotabato.

14/09/2026

On going HDPE (high-density polyethylene) pipe installation In Tambler, General Santos City..

On going project in Tambler, General Santos City
04/09/2026

On going project in Tambler, General Santos City

Retrofit Project in Polomolok, South Cotabato dahil sa lumalakas na lindol...
01/09/2026

Retrofit Project in Polomolok, South Cotabato dahil sa lumalakas na lindol...

Address

Purok San Agustin, Poblacion
Polomolok
9504

Telephone

+639271606200

Website

Alerts

Be the first to know and let us send you an email when Sentjon Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share