08/02/2026
Here is the next phase for the commercial building uptown Oskaloosa . In these pictures it will show the demo removing all materials off walls . Removing old ceiling tile and light fixtures, cutting out a wall installing a header for a short wall . The replacement of the ceiling tiles and carpet tile is approximately 1200 ft.² . The removal of materials and installing sheet rock in four rooms, a long hallway and a full remodel of a bathroom. The work on the all walls included installing sheet rock, mud, tape, texture, primer, Painting . The work done to the ceiling was to install grid system and new ceiling tile and insulation in all rooms a new upgraded light fixtures . As far as the bathroom, it was a full remodel, new sheet rock, mud, tape, texture, primer, painting, install final plank flooring . 
There was two subcontractors that helped get this project completed .
Vande wall plumbing : Luke and his team did an excellent job assisting us with all of our plumbing needs they help install a shut off valve on the main line feeding the building 
Vande wall  electric  Addison and his team did a fabulous job relocating light switches and plug-ins running some new wires .
The Oskaloosa Police Department was a big help by letting us rent parking spots in front of the building for the loading of old materials and unloading new . 
 The city of Oskaloosa inspectors did an excellent job going over the scoop of the project coming up with a plan that included all of code regulations .