Halfway through our latest project in Wynnum, QLD
Replacing the old roof with new Zincalume corrugated sheeting on the main roof and 0.48 BMT Prodek on the lower-pitched sections to accommodate the water flow.
We’re also installing new 40 mm metal battens, 60 mm Anticon insulation and upgraded tie-down strapping to bring the roof up to current building code requirements, along with new 140 × 40 mm H3 structural pine collar ties secured with bolts.
Not a straightforward project, but we’re getting it done nevertheless 💪