29/10/2026
WATERPROOFING | STAGE 6 💧
Waterproofing all wet areas in accordance with AS 3740:2021 Australian Standards to ensure long-term protection and durability.
✔️ Epoxy moisture seal primer
✔️ Bond breakers, synthetic flanges and bandaging to corners, joins and water penetrations
✔️ Aluminium waterstop angles installed
✔️ Membrane applied below and above the screed
✔️ Two coats of polyurethane membrane to walls and floors
Timeframe: 2–3 days, depending on products and drying times.
Quality waterproofing is essential for a bathroom built to last.