14/10/2026
So guys, all the other jobbies got put on hold, because I had this trench dug by Chris on the digger.
And apparently we are expecting rain...ππ€
So that meant, hurry up and do this french drian before a deluge of water fills it up for me and not the way it needs to be done! π€£
So....ta da....
This actually took me three days. Cos shovelling two trailer loads of rocks and 3 cubic metres of fill (from the hole) its bloody hard work! (I am now suffering quietly. In the air-conditioning, on the lounge, with snacks and drinks....but everything hurts π€)