18/06/2026
Back at our Eighty Eight O’Connell project,
This time we returned to complete the basement and foyer renovation. The goal was to freshen up the space and bring more brightness and life into the area and the results speak for themselves.
We transformed the concrete walls with a clean bright white finish and a touch of black to complete areas, caulked all corners, sealed the floor perimeter with Sikaflex, and completed all painted surfaces using a long lasting Dulux 3 coat system including preparation, priming and final coats for a durable finish long lasting finish.
📲 0448 420 008
📧 [email protected]
Looking to transform your space? Get in touch for a free quote.