22/09/2026
What you see on the surface doesn’t always tell the full story. 👀
During demolition, we uncovered a failed previous waterproofing installation with exposed fibreglass reinforcement and poor substrate preparation. This is exactly why every layer must be installed correctly—shortcuts eventually become expensive problems.
We’ll strip it back, properly prepare the substrate and rebuild the waterproofing system to meet Australian Standards before installing the new tiles.
At RTC Projects AU, we don’t cover problems—we rectify them properly. 💪
BuildingRectification QualityWorkmanship SydneyTilers NSWConstruction