28/10/2026
American Academy Larnaca (AAL) Phases C & D – presented in two acts.
This and the following post focus upon the next two components of the AAL Master-Plan, which we have been developing in close and productive collaboration with the Academy over the past several years.
More specifically, this post concentrates on Phase D, which is to replace the existing Weir Hall located on Gregori Afxentiou Avenue – a primary artery in Larnaca. Having said that, the Project intentionally retains the image of the existing Propylaea – which is interpreted as the building’s key component anchoring collective memory.
By conceptually organising the proposed architecture around the existing Propylaea as an ‘urban objet trouvé’, Phase D retains the centrality, legibility and intelligibility of the existing Propylaea, which are now counterbalanced by a structure that seeks to follow and deviate from precedent.
In terms of function, Phase D strives to offer a radically improved version of the Institution’s Public and Collective Infrastructure – such as, Amphitheatre, Library, Administration and the like. The forthcoming post will concentrate on Phase C – which physically and programmatically connects the preceding with the Senior School’s existing buildings.