15/10/2026
NEW FARNLEY.
grind and repointed 20 sq mtr .
added a drip lath around the edge off the roof perimeter to stop water running down the render. added a torch on felt drips with a wooden drip insert .primed all the edges to create a better stronger bond to the old roof felt .render is coming off on this job to be renewed π. please get intouch for your free quote ππ»