3 floors. 5 days. Job done. 💪
Just finished up on this stunning new build, with a 20mm XPS cement-coated overlay system installed throughout all three levels.
We installed and pressure tested the manifolds, completed the full UFH installation and then screeded the lot — start to finish in just 5 days.
We’re very proud of this one.
Straight pipe runs.
Spacing bang on.
Every board taped and properly fixed.
Manifolds installed neat and tidy.
The attention to detail from the boys was class from day one. 👌
Once the screed goes down, nobody sees what’s underneath. That’s exactly why we get it right.
It’s the work you don’t see that makes the difference — helping create a floor that’s built to perform for years to come.
A house like this deserves a floor to match, and that’s exactly what it’s got.
Three levels turned around in 5 days without cutting a single corner takes a proper team — and the lads delivered. Credit to them for the shift they put in. 💪
Got a project coming up?
If you want your underfloor heating and screed handled by one experienced team who actually care about the finish, give us a shout.
One contractor. One point of contact. Less problems.
📞 07753 327770 / 07423 678286
📧 [email protected]
🌐 nextlevelufhs.co.uk