Jinx Plastering

Jinx Plastering 🏠 All plastering work covered — internal & external.
🛠️ 12+ years of experience bringing walls to life.
✨ Smooth, reliable, professional finishes every time.

Turning tired bathrooms into smooth finishes 💥Don’t skip the before and after on this one!Customer removed all old tiles...
24/08/2026

Turning tired bathrooms into smooth finishes 💥

Don’t skip the before and after on this one!

Customer removed all old tiles we started with a blank canvas 📋
Scrape off loose adhesive/ paint. Fill chases. Fiberglass tape all cracks and chase joins. Fresh beads around the window. Bostik green grit to control the suction. Multi-finish plaster for a smooth durable finish.

Jinx Plastering KJ Plastering

TUESDAYS SCRIM & SKIM 💥Customer boarded this one! We came in and sharpened all the openings with stainless‑steel thin‑co...
17/08/2026

TUESDAYS SCRIM & SKIM 💥

Customer boarded this one! We came in and sharpened all the openings with stainless‑steel thin‑coat beads ✨, then taped every bead, board join, and screw head with fibre tape to reduce the chances of movement cracks over time 🔧🧱



Jinx Plastering KJ Plastering

Cowbridge — Part Four | Hallway Stage 🏗️⚡• Onto the hallway section of the extension now, following on from the downstai...
07/08/2026

Cowbridge — Part Four | Hallway Stage 🏗️⚡

• Onto the hallway section of the extension now, following on from the downstairs room in Part Three 🤘
• Scrimmed, beaded and tightened up throughout! all the prep sorted ready for a sharp finish 🫡
• Skim completed through the hallway, bringing the whole flow of the extension together with a clean, smooth finish 🕺✨
• Another area ticked off and ready for paint, this project is moving fast and looking better every step 🔨🔥

Cowbridge extension coming along nicely — once the doors have been put in and the stairs have been moved, we’ll be back to finish up 🚀



Jinx Plastering C. J. Williams Plastering Contractor

Cowbridge — Part Three 🔨🔥Downstairs room of the extension• Dropping down from the upstairs work in Part Two and into the...
03/08/2026

Cowbridge — Part Three 🔨🔥

Downstairs room of the extension

• Dropping down from the upstairs work in Part Two and into the downstairs room 👊
• Scrimmed and beaded up, ready for a clean, sharp finish 🎯
• Skim completed in the downstairs room, tying in nicely with the extension so far 👌✨
• Hallway coming next in Part Four 🔨🔥

Another tidy section wrapped up — this extension is taking shape fast 🚀



Jinx Plastering C. J. Williams Plastering Contractor

Cowbridge — Part Two 🥵🔥Upstairs of the extension• Upstairs all boarded out by Karl and the boys over at monolithic brick...
30/07/2026

Cowbridge — Part Two 🥵🔥

Upstairs of the extension

• Upstairs all boarded out by Karl and the boys over at monolithic bricklaying 👊
• We came in and ran all the beads, sorted the prep, and got everything tight 🎯
• Full upstairs skim out with a clean, sharp finish throughout✨
• This section is now ready for paint and final touches — another tidy bit of progress on the Cowbridge job 🎨

Another stage of this Cowbridge project wrapped up beautifully, and the place is really starting to take shape 🔥🚀



Jinx Plastering C. J. Williams Plastering Contractor

Sharp skim out — Cowbridge Part One 👌 For Karl and the team over at MONOLITHIC BRICKLAYING • The boys smashed the boardi...
25/07/2026

Sharp skim out — Cowbridge Part One 👌

For Karl and the team over at MONOLITHIC BRICKLAYING

• The boys smashed the boarding on the extension they built 🏠
• We came in and fitted all beads for crisp, clean edges.
• Taped all screw heads and bead lines to ensure a solid, crack‑resistant finish 🔧
• Full sharp skim out leaving a smooth, flawless base ready for the next stage ✨

Part Two coming soon — on the other extension at the same property🔥



Jinx Plastering C. J. Williams Plastering Contractor

Fresh kitchen prep done right 🔥 • Customers removed all old tiles and the original ceiling removed 🔧• Filled all chases ...
22/07/2026

Fresh kitchen prep done right 🔥

• Customers removed all old tiles and the original ceiling removed 🔧

• Filled all chases where the electrician had run new cables, ready for a smooth finish.

• Reboarded the ceiling with fresh 12.5mm plasterboards, taping all joints and screw heads to minimise any chance of cracking 🧱

• Primed all walls with Bostik Plastering Grit to control suction and create the perfect key for the new plaster coat 🎨

• Reboarded the head and reveals around the bifold doors with skim coat beads for a clean, sharp finish.

BOSTIK

C. J. Williams Plastering Contractor

From flaky to flawless✨————————————-Chase Filling 🔧All chases were filled neatly to create a uniform base.Ceiling Patch‑...
11/07/2026

From flaky to flawless✨
————————————-

Chase Filling 🔧
All chases were filled neatly to create a uniform base.

Ceiling Patch‑In 🪜
Damaged ceiling boards were reinstated for a stable, even surface.

Dot & Dab Boarding 📐
New boards fitted around windows and doors to tidy up edges and improve structure.

Blue Grit Prep 🔵
Blue grit applied to control suction and guarantee a strong bond.

Over‑Skim Finish 🎨
Finished with a smooth, consistent skim ready for decorating.

Jinx Plastering
C. J. Williams Plastering Contractor

Ceilings Completed After Water Damage 🛠️✨Customer removed the old lath and plaster ceilings after water damage.We came i...
05/07/2026

Ceilings Completed After Water Damage 🛠️✨

Customer removed the old lath and plaster ceilings after water damage.
We came in and boarded everything, taped all joins and screw heads to minimise any future popping or cracking, then finished it with a fresh skim. 🎨

Ceilings now complete and ready for the customer to finish exposing the internal stone work so it can be repointed, sealed, and have fresh coving fitted all around. 🧱🔧

KJ Plastering

Heatwave Tuesday on this one 🥵The boys got this job all boarded and gritted up, ready for me and my brother KJ Plasterin...
28/06/2026

Heatwave Tuesday on this one 🥵

The boys got this job all boarded and gritted up, ready for me and my brother KJ Plastering to come in, bead up and start getting some mixes on 😆

First set was a tidy 3‑bagger, second set pushed out to a 4‑bagger and in that heat it took some doing, but we kept it steady and pulled a clean finish through the lot 👊

Serious graft in some serious temperatures… felt like skimming the inside of an oven 🔥

Got it turned around and ready for Thomas Adams-Norton and the boys to crack on and get the kitchen fitted 💪

Address

Ystradgynlais
Swansea

Website

Alerts

Be the first to know and let us send you an email when Jinx Plastering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share