31/08/2026
βοΈ Successfully Installed | 10.4 kW Hybrid Solar System β Bahria Enclave, Islamabad
We are proud to announce the successful installation of a 10.4 kW Hybrid Solar System at Bahria Enclave, Islamabad, completed on 25 August 2026.
πΉ System Highlights: β’ 16 Γ 650W LONGi Hi-MO X10 Solar Panels
β’ Fox ESS KH10.5 Hybrid Inverter
β’ Premium H-Beam Steel Structure
β’ Dedicated Earthing Bore
β’ Professional protection, wiring & installation
β’ Engineered for reliable power and long-term performance
At Contrast Engineering, we don't just install solar systemsβwe engineer them for safety, reliability, efficiency and long-term value.
β‘ Powering Homes. Engineering a Better Future.
π Bahria Enclave, Islamabad
π Contact Contrast Engineering for a professional site survey and customized solar solution.