09/11/2026
It has come a long way! Look at our full kitchen renovation from start to “almost” finish!
- Full demo,
- ceiling raised from 8’ to 10’
- Spray foam insulation,
- reframing of walls, windows, open wall with installed beam, & sliding glass door,
- drywall finishing with texture ceiling,
- new electrical with GFCI’s, light fixtures, double oven & gas cook top,
- tile flooring,
- Custom cabinets with butcher block tops,
- all new plumbing,
- appliances installed,
Crew have worked very hard on this project & have learned a lot on the way!