09/20/2026
Another major rot repair wrapped up!
The damage to this basement wall was clearly visible from the outside, but the full extent became apparent once we started opening it up. We removed the deteriorated sheathing and framing, rebuilt the exterior wall, installed ZIP System sheathing, new double doors, and a pressure-treated landing.
There’s still some siding and finish work to complete, but the structural repairs are finished and this wall is solid once again.