10/15/2026
Its been a while since we posted progress on the Miller/Lowry house. We have been blessed with the opportunity to be apart of such a large scale renovation. We completely reframed the floor systems throughout the main level of the house, rerouted staircase to the basement and second story, built a master bedroom/bathroom additon, tore off and reframed the kitchen and southeast lower section of the house, and changed the layout of some interior rooms. The next phase of this project will be the exterior. Siding, doors, windows, front porch, and much more! Like and follow to see more progress on the projects we are working on.