Triumph Handyman Services, LLC

Triumph Handyman Services, LLC We can help you triumph over the small projects around your home. About The Founder

Christopher Cook, former Vice President of Cook’s Kitchen and Bath, Inc.

in Benicia, CA, now resides in Mt Juliet, Tennessee. Not only has he brought his 17 years of experience in the home improvement industry with him, but also his creativity, passion to serve others, and his strong work ethic. Chris wants to bring high-level, high-quality service that he’s been used to offering with larger remodeling projects he’s done in the past, to the smaller projects that many people have around their homes. Projects that homeowners just haven’t been able to take care of. Either due to time restraints, or simply because some projects were just too small for a local General Contractor.

Projects of the Week 10-10-26Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and a...
10/11/2026

Projects of the Week 10-10-26

Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and asked us to help him to get some projects completed around his home to prepare for putting it on the market. We plan to renovate 4 bedrooms and the kitchen, including new flooring, new windows & doors, and painting, along with a few smaller projects spanning over a few months which started in mid July. Along with some work in both his attached and detached garages as well.

The week started with the installation of the new flooring in what I'm calling "Bedroom 1", which is 1 of 4 bedrooms including the Master. I had completed the flooring installation in the Master BR the week prior. I proceeded to install baseboards in both bedrooms, and some door casings. I then caulked all the trim, and filled nail holes. Before painting all the newly installed trim I sanded the nail fills. I also painted some of existing trim in the hallway, as well as the jambs for the hall bath and pantry closet. I installed the new bypass closet doors in bedroom 1 as well. I then painted the new closet doors, and the doors for both the hall and Master bathrooms. Kevin's Boxer "Hank" made sure the closet doors were installed and painted correctly.

(Music Attributed to Kevin MacLeod)

See more "Project of the Week" galleries on our website!
TriumphHandyman.com/projects

10/11/2026

Painting Trim & Doors

Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and asked us to help him to get some projects completed around his home to prepare for putting it on the market. We plan to renovate 4 bedrooms and the kitchen, including new flooring, new windows & doors, and painting, along with a few smaller projects spanning over a few months which started in mid July. Along with some work in both his attached and detached garages as well.

I worked a few days before I put up this reel. What the reel doesn’t show is the installation of the new baseboards, and some door casings. Then I caulked and filled nail holes. Before painting the trim in the two rooms that I recently installed new flooring in, I sanded all the nail fills. Then I installed the new bypass closet doors after I painted those as well, and the casing around the closet. I also painted the doors for the master bedroom, and hall bath as well as all the door casings around both of them. The casing and jambs for the hall closet/pantry also received new paint.


Call or text today, and let Triumph Handyman Services help you triumph over the small projects around YOUR home!
629-250-8135

MUSIC
Title: Olive Wh***ey
Artist: Summer Islands
Link: https://www.facebook.com/sound/collection/?sound_collection_tab=sound_tracks&asset_id=1432579998928758&reference=artist_attr

10/06/2026

Flooring PART 1 - Master BR & Bedroom 1

Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and asked us to help him to get some projects completed around his home to prepare for putting it on the market. We plan to renovate 4 bedrooms and the kitchen, including new flooring, new windows & doors, and painting, along with a few smaller projects spanning over a few months which started in mid July. Along with some work in both his attached and detached garages as well.

Kevin and his family left town for a week, so I changed gears and went right into flooring installation while they are away. I managed to get their Master Bedroom done, along with Bedroom one. The first bedroom that I worked on earlier in the summer, and put a new layer of sub-flooring down in. Next I will be installing the baseboards in both bedrooms, then caulk and paint them.
,

Call or text today, and let Triumph Handyman Services help you triumph over the small projects around YOUR home!
629-250-8135

MUSIC
Title: Drive
Artist: Bryan Todd
Link: https://www.facebook.com/sound/collection/?sound_collection_tab=sound_tracks&asset_id=1928790777790582&reference=artist_attr

As you may have noticed from our posts for the last couple months we are away from the Nashville area working on a proje...
10/05/2026

As you may have noticed from our posts for the last couple months we are away from the Nashville area working on a project through October, but November is open and filling up. Go ahead and request your appointment now to lock in your preferred time — or call or text to get on the calendar before spots fill.

You can use our new scheduling system on our updated website. While you're on the new site, feel free to check out our new service packages, subscription plans, and our new client portal that gives you a private, organized space to track every job, store your home's history, and stay connected with us at any time.

Click here to schedule now!
TriumphHandyman.com/schedule

Projects of the Week 10-03-26Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and a...
10/04/2026

Projects of the Week 10-03-26

Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and asked us to help him to get some projects completed around his home to prepare for putting it on the market. We plan to renovate 4 bedrooms and the kitchen, including new flooring, new windows & doors, and painting, along with a few smaller projects spanning over a few months which started in mid July. Along with some work in both his attached and detached garages as well.

This past week was very productive. I finished up the kitchen cabinet installation, for the most part. I installed the crown riser material, then the crown molding. Then I placed all the doors back on and put the drawers back in. There are still some moldings to apply, and the toe kick skin material, but that will all be complete once the new flooring is down in the kitchen.

Kevin and his family left on a trip for a week, so I took the opportunity to work on their Master Bedroom. I removed their items, and then took up the old carpet and padding. I then primed the lower section of the walls below the chair rail molding, and then painted the entire bedroom, including the chair rail molding and the ceiling. Once the paining was done I moved right on to the new flooring set at a 1/3 offset.

(Music Attributed to Kevin MacLeod)

See more "Project of the Week" galleries on our website!
TriumphHandyman.com/projects

, ,

10/03/2026

Cabinet Skins & Molding - PART 2

Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and asked us to help him to get some projects completed around his home to prepare for putting it on the market. We plan to renovate 4 bedrooms and the kitchen, including new flooring, new windows & doors, and painting, along with a few smaller projects spanning over a few months which started in mid July. Along with some work in both his attached and detached garages as well.

I wrapped up the cabinet installation, for the most part. The crown molding is up, and caulked to the ceiling. Then I placed all the drawers in and doors on all the cabinets. I still have a few more pieces of molding and the toe kick skin to install after the stone tops are on and the new flooring is in. Ordinarily I would have waited to put the drawers in and doors on the cabinets, but I needed to clear out the bedroom I was storing them in so I could put everything from the Master Bedroom in there. That room is being worked on next, starting with carpet removal, and painting. Then starting the new flooring in Master BR while Kevin and his family are out of town for a week.


Call or text today, and let Triumph Handyman Services help you triumph over the small projects around YOUR home!
629-250-8135

MUSIC
Title: Face The Sun
Artist: Jonny Houlihan
Link: https://www.facebook.com/sound/collection/?sound_collection_tab=sound_tracks&asset_id=187125714135094&reference=artist_attr

10/02/2026

Cabinet Skins & Molding

Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and asked us to help him to get some projects completed around his home to prepare for putting it on the market. We plan to renovate 4 bedrooms and the kitchen, including new flooring, new windows & doors, and painting, along with a few smaller projects spanning over a few months which started in mid July. Along with some work in both his attached and detached garages as well.

Once all the cabinets were up I went ahead and applied the cabinet skins, and then installed the crown riser material in which the crown molding will be attached to later in the next Part 2 reel. Much of the riser material was pre-assembled before I installed it.


Call or text today, and let Triumph Handyman Services help you triumph over the small projects around YOUR home!
629-250-8135

MUSIC
Title: Ever Need (feat. Wardel) (Instrumental)
Artist: ill Think in ink
Link: https://www.facebook.com/sound/collection/?sound_collection_tab=sound_tracks&asset_id=1080561374070976&reference=artist_attr

Projects of the Week 09-26-26Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and a...
09/28/2026

Projects of the Week 09-26-26

Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and asked us to help him to get some projects completed around his home to prepare for putting it on the market. We plan to renovate 4 bedrooms and the kitchen, including new flooring, new windows & doors, and painting, along with a few smaller projects spanning over a few months which started in mid July. Along with some work in both his attached and detached garages as well.

This past week started out with the texturing of all the areas where drywall was hung and repaired. Then I used a PVA drywall primer to prime all those same areas. I then proceeded to get all the trim in the kitchen painted. Some trim will need to be cut and re-installed later to butt up to the new cabinetry. I wanted to get most of the painting done before I install the riser material and then the crown molding which will be done this following week after I install the 2nd fridge panel and above fridge cabinet. I installed the final wall cabinet on the left of the window as well.

I also had to install the wall cabinet skin panels before I install the new riser material on the top of the cabinets. I used 23 gauge pin nails to preassemble the corners of the riser material to ensure a tight joint. Once I install the 2nd fridge panel and cabinet I will finish out the rest of the riser material, and proceed with crown molding installation.

(Music Attributed to Kevin MacLeod)
TriumphHandyman.com

, ,

09/26/2026

Kitchen Texture, Prime and Paint

Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and asked us to help him to get some projects completed around his home to prepare for putting it on the market. We plan to renovate 4 bedrooms and the kitchen, including new flooring, new windows & doors, and painting, along with a few smaller projects spanning over a few months which started in mid July. Along with some work in both his attached and detached garages as well.

I haven’t posted any progress reels for a while because I’ve been updating our new website, so go check it out when you can www.TriumphHandyman.com

These fast few days I worked on getting Kevin’s wall textured, primed and painted. I first sanded the drywall patches, and then used a Wagner Power Tex machine that I borrowed from my Brother Dave. When that dried I scraped and sanded the high & rough spots before priming using PVA drywall primer. I also primed the wall right above the counter because tile adhesive adheres better to primer than it does to raw drywall and mud. I will be installing a tile backsplash down the road after the countertops are installed. I’m planning to do some flooring installation before then when Kevin and his family are away for a week. Then final I painted the entire kitchen using the same color and sheen as they used previously. I will finish the cabinet installation next.


Call or text today, and let Triumph Handyman Services help you triumph over the small projects around YOUR home!
629-250-8135

MUSIC
Title: The Moment
Artist: Indigoe
Link: https://www.facebook.com/sound/collection/?sound_collection_tab=sound_tracks&asset_id=28484074571237622&reference=artist_attr

Projects of the Week 09-19-26Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and a...
09/20/2026

Projects of the Week 09-19-26

Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and asked us to help him to get some projects completed around his home to prepare for putting it on the market. We plan to renovate 4 bedrooms and the kitchen, along with a few smaller projects spanning over 8 to 10 weeks which started in mid July. Along with some work in both his attached and detached garages as well.

The past two weeks have been very busy. It's been so busy that I skipped my weekly post last week. This past week I began the kitchen cabinet installation. I started with the base cabinets in the corner of the kitchen. Then went down the line, drilled holes in the sink base for the plumbing, and left the 24" space for the dishwasher. Next I assembled the cabinets for the island, and set the island to 2x4 cleat material secured to the floor.

After setting the base cabinets I laid plywood sub-top down on to them in preparation for the new countertops. Then I went right into hanging the wall cabinets starting at the far end of the kitchen. I also ran new vent fan ducting up through the attic into the exhaust roof cap. Then I changed gears, and applied new wall texture on all the areas of the walls that were repaired. Next I will do some priming and maybe painting before I continue with the installation of the remaining cabinets including the fridge cabinet & panels.

(Music Attributed to Kevin MacLeod)
Triumphhandyman.com

, , , ,

Address

651 S. Mt. Juliet Road #58
Mount Juliet, TN
37122

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm

Telephone

+16292508135

Alerts

Be the first to know and let us send you an email when Triumph Handyman Services, LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Triumph Handyman Services, LLC: