C.M. Ayres Enterprises

C.M. Ayres Enterprises We provide a wide variety of services including septic installation and repairs, asphalt paving, excavation of all types, demolition, and hydro seeding.

We are fully licensed and insured. We are a family owned and operated excavation contractor based out of Parkton MD.

đźš— First impressions start before customers even walk through your doors!A smooth, well-maintained parking lot makes your...
11/12/2026

đźš— First impressions start before customers even walk through your doors!
A smooth, well-maintained parking lot makes your property look more professional and creates a better experience for everyone visiting your business.
Cracks, potholes, and uneven pavement? Those aren't exactly the welcome you want to give!

Happy Veterans Day from C.M. Ayres Enterprises!Today, we want to take a moment to thank all the brave men and women who ...
11/11/2026

Happy Veterans Day from C.M. Ayres Enterprises!
Today, we want to take a moment to thank all the brave men and women who have served our country.
To all our veterans, thank you for your service!
❤️🤍💙

Spring paving season starts with planning ahead in winter!If your commercial parking lot needs a refresh, now is the tim...
11/04/2026

Spring paving season starts with planning ahead in winter!

If your commercial parking lot needs a refresh, now is the time to start preparing. Early planning helps you coordinate your project, explore paving options, and get ready for the busy spring season.

👉 Read our latest blog to learn more: https://www.cmayres.com/planning-spring-commercial-parking-lot-paving-winter

Learn how Maryland property owners can use winter to evaluate, budget and schedule a commercial parking lot paving project for spring.

A smooth asphalt surface starts with what you don’t see.Proper grading, drainage, base preparation, and compaction all p...
10/29/2026

A smooth asphalt surface starts with what you don’t see.
Proper grading, drainage, base preparation, and compaction all play a major role in how well a driveway performs over time.
That’s why a quality paving project is about more than laying fresh asphalt — it starts with preparing the site correctly.
👉 Planning a new driveway or paving project? Send us a DM!

Thinking about installing a new driveway? The timeline starts well before the paving crew arrives.Site access, drainage,...
10/22/2026

Thinking about installing a new driveway? The timeline starts well before the paving crew arrives.
Site access, drainage, grading, excavation, base preparation, weather, material availability, and curing time can all affect how long the project takes and when the driveway is ready to use.
In our latest blog, we explain the typical planning timeline for a driveway installation in Towson and what homeowners should expect from the first consultation through completion.
👉 Read the full article: https://www.cmayres.com/driveway-installation-planning-timeline-towson-md

Follow the driveway installation process in Towson, MD, from the initial site evaluation and drainage plan through paving and the final walkthrough.

Small driveway issues can become bigger problems once freezing temperatures, snow, and ice arrive.Cracks, poor drainage,...
10/15/2026

Small driveway issues can become bigger problems once freezing temperatures, snow, and ice arrive.
Cracks, poor drainage, and low spots can all put extra stress on the pavement during winter.
Fall is a good time to inspect your driveway and address problems before the weather gets worse.

Planning an asphalt paving project? The final scope depends on much more than the size of the surface.Existing pavement ...
10/08/2026

Planning an asphalt paving project? The final scope depends on much more than the size of the surface.
Existing pavement condition, drainage, grading, base preparation, access, traffic needs, and the intended use of the area can all affect how the project should be planned and priced.
In our latest blog, we break down the key factors that shape an asphalt paving project in Baltimore and what property owners should understand before comparing estimates.
👉 Read the full article: https://www.cmayres.com/asphalt-paving-scope-baltimore-md

Learn what shapes an asphalt paving project in Baltimore, MD, including pavement use, excavation, base preparation, drainage, access and site conditions.

Planning a septic tank installation before your fall construction schedule gets busy?Septic work involves more than choo...
09/24/2026

Planning a septic tank installation before your fall construction schedule gets busy?
Septic work involves more than choosing an installation date. Permitting, soil conditions, equipment access, grading, drainage, excavation, and coordination with other contractors all need to fit into the overall site plan.
In our latest blog, we explain why early planning can help keep septic installation from slowing down other construction work, especially when driveways, utilities, grading, or site preparation are part of the same project.
👉 Read the full article:
https://www.cmayres.com/septic-tank-installation-planning-before-a-fall-construction-schedule

Plan septic tank installation before a fall construction schedule with site evaluation, permitting, access, excavation, grading, and site preparation.

A sneak peek behind the scenes! 🙌
09/22/2026

A sneak peek behind the scenes! 🙌

Thank you for your kind words and trust! Your reviews inspire us every day! 🤩
09/17/2026

Thank you for your kind words and trust! Your reviews inspire us every day! 🤩

Address

17A Onion Boulevard
Shrewsbury, PA
17361

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+14108684020

Alerts

Be the first to know and let us send you an email when C.M. Ayres Enterprises posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to C.M. Ayres Enterprises:

Shortcuts

Share

Nearby home improvement businesses