10/15/2026
Two day bridge deck replacement! Poured 8 inches thick with #5 bar on 12” centers this deck is going to out last any other option on the market! We took it one step further to reduce down time and poured it with a 4500 psi AHE mix with heavy 300 fiber mesh allowing traffic travel to resume in 72hrs and a final rating topping 6000psi !