06/22/2026
Brendees saga
part #3
Structural problems
This next chapter of the saga isn’t the most interesting part of the story, but it did have a significant impact on why it took so long to reopen, so I think it’s worth mentioning.
I had said in an earlier post that the original restoration contractor had rebuilt the burned out roof structure in an attempt to seal up the building.
That attempt fell significantly short of the mark.
Aside from the poorly boarded up window openings, improperly executed rubber roofing repairs, leaking shingles, missing flashing and siding work that left exposed framing at every corner of the dormers, the structural repairs were horrendous.
When we discovered that no permits were pulled for the first floor repairs, we also discovered that the only permit they did obtain was for the demolition and rebuilding of the roof structure.
This permit included detailed instructions from an engineer on how to proceed with the repairs.
These instructions were not followed and no final inspection had ever been performed.
Furthermore, during demolition, most of the apartments original doors and architectural mill work had been removed and discarded. As well as the original spiral staircase accessing the third floor loft.
So, in order to move forward with the first floor renovations, the original permit had to be satisfied and closed out.
Given the fact that it had already been 2 years since the fire, no further extensions would be granted on the original permit and they would not grant any further permits for this address to the original contractor moving forward.
After walking through with the project manager of the restoration company, the building inspector and the engineer, it was determined that all 3 of the main supporting beams were in the wrong locations and not supported correctly.
The floor joists for the third floor were installed wrong.
The rafters were installed wrong, the drywall on the bar ceiling was wrong, no insulation was installed and all of the specified hardware was missing.
Basically, everything they had done so far was wrong.
Now we had 1 month left before the permit expired to get all of these issues corrected and inspected.
We immediately got to work.
We had to temporarily support the roof structure while cutting out and replacing all of the support beams, replaced all of the new floor joists with newer ones that actually fit, brought everything up to code and passed inspection in less then a month.
Up until this point, in order to make progress for the owners of brendees, I was still operating as a subcontractor to the restoration company.
It had been over a year since I began trying to work with this company. During that time, they had replaced their project manager 5 times and couldn’t seem to find the workers or the resources to make any progress at all.
At one point I arrived on site to find 2 unsavory characters with hair dryers, patching a hole in the drywalled ceiling above the bar which had previously been considered “finished”.
When questioned about it they revealed a misunderstanding where they had been instructed to cut a hole in the first floor ceiling in order to install 2 dormer windows on the third floor. The windows had already been stored on the second floor awaiting installation yet somehow, while standing on the second floor, looking up to the third floor at the openings these windows were intended for, they decided to cut a hole through the first floor ceiling!
If that wasn’t bad enough, it was then discovered that the first floor ceiling was not 2 layers of fire shield drywall as required by code, there was no insulation installed prior to drywall, and the windows in question didn’t even fit the location they were intended to go!
So, now that the structural issues were corrected and the original permit closed out, the restoration company was prohibited from acquiring any new permits for this project.
At this point they were told to cease all involvement with the project.
In November of 2025, 2.5 years after the fire, my crew took over.
6 months later, Brendees was completed!