26/10/2026
INSECT SCIENCE | PHASE 3 – THE BRIDGE
The third and final phase of the Insect Science development, aptly named “The Bridge”, serves as the headquarters and central command center of the entire operation.
The name carries a double meaning. Quite literally, a pedestrian bridge spans across the water, connecting the building to the rest of the facilities. Figuratively, much like the bridge of a ship, from where the operation is steered and important decisions are made.
The brief called for a building that would reflect this important role, with a strong emphasis on quality office spaces, an impressive boardroom, and comfortable entertainment and social areas.
A particularly rewarding aspect of this project was creating a workplace that feels like much more than just an office.
A fitting final chapter to the Insect Science development, bringing together architecture, landscape and functionality.